{"id":29689,"date":"2021-06-23T09:28:43","date_gmt":"2021-06-23T16:28:43","guid":{"rendered":"https:\/\/ssi-corporate.com\/?p=29689"},"modified":"2021-06-30T09:38:05","modified_gmt":"2021-06-30T16:38:05","slug":"first-steps-to-more-effective-change-management","status":"publish","type":"post","link":"https:\/\/www.ssi-corporate.com\/ja\/blog-lighthouse\/first-steps-to-more-effective-change-management\/","title":{"rendered":"First Steps to More Effective Change Management"},"content":{"rendered":"\n<p>No matter the technology in place within your shipyard, <a href=\"https:\/\/www.ssi-corporate.com\/change-management\/\" data-type=\"page\" data-id=\"28536\">managing change<\/a> more effectively is a high priority.&nbsp;<a href=\"https:\/\/www.ssi-corporate.com\/products\/digitalhub\/\" data-type=\"page\" data-id=\"2021\">Information platforms<\/a> like Product Lifecycle Management (PLM)&nbsp;systems&nbsp;are one tool that can help, and their implementation is&nbsp;becoming more common&nbsp;at&nbsp;shipyards. PLMs have long been a staple of change management and configuration control within other industries, but until recently,&nbsp;did not fit the realities of shipbuilding.&nbsp;&nbsp;<\/p>\n\n\n\n<p>Any specific implementation of a change management strategy is very dependent on what is in place and the situation in the shipyard. This means no one size fits all approach&nbsp;exists, but we can still generalize a strategy that every shipyard&nbsp;can use to start seeing results.&nbsp;Both with and without an information platform, to get a handle of&nbsp;change activities&nbsp;in&nbsp;your organization,&nbsp;you will need to understand the flow of change information, get control of your data, and (most importantly) identify the goal you are&nbsp;genuinely&nbsp;trying to achieve.&nbsp;<\/p>\n\n\n\n<p><em>Note: This post is based on an&nbsp;answer from Malay Pal, SSI Solution Specialist, to an attendee question from our latest change management webinar. You can watch the full webinar here: <\/em><a href=\"https:\/\/www.ssi-corporate.com\/content\/how-to-stop-worrying-about-shipbuilding-change\/\"><em>https:\/\/www.ssi-corporate.com\/content\/how-to-stop-worrying-about-shipbuilding-change\/<\/em>&nbsp;<\/a><\/p>\n\n\n\n<h3 class=\"wp-block-heading\">You already&nbsp;manage&nbsp;change&nbsp;<\/h3>\n\n\n\n<p>Even if you don&#8217;t have a&nbsp;change management specific solution, PDM, or PLM system,&nbsp;you do have a&nbsp;change management&nbsp;process&nbsp;of some kind. You already manage&nbsp;change&nbsp;in some way.&nbsp;Before using IT tools to manage engineering change, it is necessary to look at the strategies and practices for managing engineering change.&nbsp;&nbsp;<\/p>\n\n\n\n<p>First, you need to ensure that your organization understands how changes flow and the processes already used to manage change. You don&#8217;t need to have a detailed understanding of everything, but enough to know where the&nbsp;significant&nbsp;causes of rework or errors come from.&nbsp;Then, once&nbsp;you have identified a significant source of change related issues, address it.&nbsp;<\/p>\n\n\n\n<p>Other strategies&nbsp;include:&nbsp;reducing the number of engineering changes, early detection and implementation of&nbsp;engineering changes,&nbsp;making&nbsp;accurate assessments&nbsp;of&nbsp;engineering changes&nbsp;to ensure that they are necessary,&nbsp;the&nbsp;efficient implementation of&nbsp;engineering changes&nbsp;(using&nbsp;the&nbsp;right resources&nbsp;and&nbsp;tools), and reviewing and evaluating&nbsp;engineering changes&nbsp;after&nbsp;their&nbsp;implementation&nbsp;to adjust processes in the future.&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Tactics&nbsp;and processes&nbsp;to support change management&nbsp;strategies&nbsp;<\/h3>\n\n\n\n<p>For complex products like ships, several practices and tools can support these strategies.&nbsp;Instituting&nbsp;a clear Engineering Change Management (ECM) process that supports effective control of product changes&nbsp;makes the&nbsp;information&nbsp;behind&nbsp;each change&nbsp;easily discoverable.&nbsp;Establishing&nbsp;a design authority to&nbsp;wield&nbsp;the necessary control in ECM&nbsp;mitigates&nbsp;the risk of a change falling through the cracks. The design authority&nbsp;should include&nbsp;representatives&nbsp;from all stakeholder organizations (i.e., a&nbsp;cross-functional&nbsp;team) to&nbsp;manage and&nbsp;work on&nbsp;engineering changes.&nbsp;Doing so reduces the chance of&nbsp;siloed working.&nbsp;<\/p>\n\n\n\n<p>Some other tactics&nbsp;to consider are:&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>Developing several solutions to&nbsp;engineering changes.&nbsp;<\/li><li>Assessing&nbsp;the change\u2019s&nbsp;impacts&nbsp;on time and cost.&nbsp;<\/li><li>Involving of production&nbsp;teams&nbsp;early in the design and engineering process.&nbsp;<\/li><li>Involving of suppliers early in the&nbsp;change&nbsp;assessment and implementation process and cross-enterprise ECM process (if applicable).&nbsp;<\/li><li>Documenting and providing centralized access to&nbsp;change&nbsp;status and history.&nbsp;&nbsp;<\/li><li>Instituting a formal&nbsp;post-implementation&nbsp;review of&nbsp;engineering changes.&nbsp;<\/li><\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">Tools as a catalyst to&nbsp;effective&nbsp;change management&nbsp;<\/h3>\n\n\n\n<p>Naval shipbuilding projects are&nbsp;more often than not&nbsp;more&nbsp;complex, involve&nbsp;more&nbsp;varied stakeholders,&nbsp;and have longer design, build, and operational&nbsp;timelines&nbsp;than other shipbuilding projects. These types of projects&nbsp;necessitate&nbsp;the&nbsp;use of computer-based tools to support change management.&nbsp;<\/p>\n\n\n\n<p>However,&nbsp;no&nbsp;one&nbsp;tool&nbsp;is&nbsp;a silver bullet. Some&nbsp;may make certain aspects of change management easier, but the right solution for your organization will depend on your specific challenges and&nbsp;requirements.&nbsp;However, the following ground rules would help in the implementation and use of all&nbsp;IT-based&nbsp;tools for&nbsp;change management:&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>Using a&nbsp;standardized data model&nbsp;to develop&nbsp;a common understanding of the underlying business process between various stakeholders (e.g. something conceptually&nbsp;similar to&nbsp;the&nbsp;SWIFT system in the banking industry).&nbsp;<\/li><li>All product (information) records should include parent and child relationships, birth and death information, revision\/modification history, and the details of any constraints on product use (guidance on use or applicability).&nbsp;<\/li><li>All staff should be familiar with&nbsp;their organization&#8217;s product information model and&nbsp;maintain an accurate recording discipline, regardless of whether their activities relate to design, procurement, manufacturing, sales, maintenance,&nbsp;or support.&nbsp;<\/li><li>It is necessary to have a clear understanding of how changes are connected. If the change situation is not understood, a tool can provide only limited help.&nbsp;&nbsp;<\/li><li>Product information should be presented&nbsp;dynamically, enabling&nbsp;users to see a product&#8217;s&nbsp;change&nbsp;history from the past, present,&nbsp;and future.&nbsp;&nbsp;<\/li><\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">Technologies to turn to&nbsp;<\/h3>\n\n\n\n<p>Looking at some more specific examples of the&nbsp;tools&nbsp;which can&nbsp;support the engineering change processes&nbsp;in shipbuilding, they&nbsp;include office productivity tools (MS Word, MS Excel,&nbsp;email), CAD software, PDM\/PLM, and ERP. Each of these tools&nbsp;provides&nbsp;different functionalities and&nbsp;requires different levels of digital maturity to use effectively.&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>Office productivity tools: Track changes mechanism, document properties management, routing (through&nbsp;email).&nbsp;<\/li><\/ul>\n\n\n\n<ul class=\"wp-block-list\"><li><strong>Document management system<\/strong>: Some document management systems provide ECM capabilities like versioning, workflow or routing, etc.&nbsp;However, such systems&nbsp;handle engineering artifacts as documents.&nbsp;<\/li><li><strong>CAD<\/strong>: Some of the COTS CAD software available for ship design and construction&nbsp;provides&nbsp;high levels of ECM capability without the need for a separate PDM\/PLM system.&nbsp; These&nbsp;ECM-specific&nbsp;capabilities include associativity between parts &amp; assemblies, file versioning, change propagation\/impact analysis\/traceability, collaboration, etc. The ECM coverage is limited to the business processes handled by the CAD software (e.g., design &amp; fabrication), after which hand-off is required to PDM\/PLM\/ERP systems to extend change management to other business functions in the shipyard\/enterprise.&nbsp;&nbsp;&nbsp;<\/li><li><strong>PDM\/PLM<\/strong>: PDM\/PLM systems provide ECM capabilities, starting with the product definition phase, and can extend to the complete ship&nbsp;lifecycle. They provide necessary ECM functionalities, like versioning, workflow or routing, search\/query, change propagation\/impact analysis\/traceability, collaboration, reports generator, knowledge management, etc.&nbsp;<\/li><li><strong>ERP<\/strong>:&nbsp;While ERP systems handle change management, such systems can&nbsp;trigger&nbsp;a change process based on production issues. When&nbsp;implementing&nbsp;a change requires a change in the product definition, a PLM system provides the necessary functionalities.&nbsp;&nbsp;<\/li><\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">Don\u2019t fall into the&nbsp;trap&nbsp;<\/h3>\n\n\n\n<p>While computer-based tools are essential to support engineering change management,&nbsp;you and your teams need&nbsp;to carefully look at the capabilities and limitations&nbsp;of the tools available&nbsp;and choose the most feasible solution&nbsp;for the shipyard. As&nbsp;the digital maturity, IT infrastructure, and challenges being solved evolve,&nbsp;your teams can incrementally implement&nbsp;more capabilities.&nbsp;<\/p>\n\n\n\n<p>Most importantly, don&#8217;t fall into the trap of thinking you need to put in a big bang style effort to implement a complete PLM system before&nbsp;seeing&nbsp;results. Some organizations waste years going down this path. At some point, maybe even while working on&nbsp;your first&nbsp;challenge, you will have enough of a view of the organization to see how a platform for managing change would connect everything. This is great, but make sure that you don&#8217;t lose focus. Pick the next piece of your process to improve and build it into the platform. If your chosen&nbsp;strategies and&nbsp;platforms&nbsp;don\u2019t&nbsp;allow you&nbsp;to enhance your solution incrementally, maybe it is time for a change?&nbsp;<\/p>\n\n\n\n<hr class=\"wp-block-separator\"\/>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\r\n    <span id=\"\" class=\"anchor\"><\/span>\r\n    <div class=\"video embed-responsive embed-responsive-16by9\" >\r\n      <iframe loading=\"lazy\" width=\"560\" height=\"315\" src=\"https:\/\/www.youtube.com\/embed\/VWG_EB3-xKs?rel=0&#038;loop=1&#038;listType=playlist&#038;list=PLAXGJ_ItGqM9FaHBFoJB9D5BcGuev9MUD\" frameborder=\"0\" allow=\"accelerometer; autoplay; encrypted-media; gyroscope; picture-in-picture\" allowfullscreen><\/iframe>\r\n    <\/div>\r\n  \n\n\n<p><\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<h3 class=\"wp-block-heading\">Webinar: How to Stop Worrying About Shipbuilding Change<\/h3>\n\n\n\n<p>Watch the webinar&nbsp;see the strategies you can implement within your shipyard to achieve&nbsp;change transparency.&nbsp;<\/p>\n\n\n\n<p>You\u2019ll log off with:&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>Strategies to get control and visibility over customer, production, or supply chain driven change.&nbsp;<\/li><li>Techniques for making, reviewing, and tracking changes with and without a PLM.&nbsp;<\/li><li>Bite-size takeaways for your team to implement as part of their change management process.&nbsp;<\/li><\/ul>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link\">Watch Now<\/a><\/div>\n<\/div>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>No matter the technology in place within your shipyard, managing change more effectively is a high priority.&#038;n [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":1819,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[440],"tags":[],"story":[6],"vertical":[13],"productline":[],"stream":[3],"content-type":[641],"language":[635],"phase":[638,637],"partner-type":[],"class_list":["post-29689","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-best-practices","story-unique","vertical-naval","stream-lighthouse","content-type-news-events","language-english","phase-build","phase-design"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.ssi-corporate.com\/ja\/wp-json\/wp\/v2\/posts\/29689","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ssi-corporate.com\/ja\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ssi-corporate.com\/ja\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ssi-corporate.com\/ja\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ssi-corporate.com\/ja\/wp-json\/wp\/v2\/comments?post=29689"}],"version-history":[{"count":16,"href":"https:\/\/www.ssi-corporate.com\/ja\/wp-json\/wp\/v2\/posts\/29689\/revisions"}],"predecessor-version":[{"id":29993,"href":"https:\/\/www.ssi-corporate.com\/ja\/wp-json\/wp\/v2\/posts\/29689\/revisions\/29993"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ssi-corporate.com\/ja\/wp-json\/wp\/v2\/media\/1819"}],"wp:attachment":[{"href":"https:\/\/www.ssi-corporate.com\/ja\/wp-json\/wp\/v2\/media?parent=29689"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ssi-corporate.com\/ja\/wp-json\/wp\/v2\/categories?post=29689"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ssi-corporate.com\/ja\/wp-json\/wp\/v2\/tags?post=29689"},{"taxonomy":"story","embeddable":true,"href":"https:\/\/www.ssi-corporate.com\/ja\/wp-json\/wp\/v2\/story?post=29689"},{"taxonomy":"vertical","embeddable":true,"href":"https:\/\/www.ssi-corporate.com\/ja\/wp-json\/wp\/v2\/vertical?post=29689"},{"taxonomy":"productline","embeddable":true,"href":"https:\/\/www.ssi-corporate.com\/ja\/wp-json\/wp\/v2\/productline?post=29689"},{"taxonomy":"stream","embeddable":true,"href":"https:\/\/www.ssi-corporate.com\/ja\/wp-json\/wp\/v2\/stream?post=29689"},{"taxonomy":"content-type","embeddable":true,"href":"https:\/\/www.ssi-corporate.com\/ja\/wp-json\/wp\/v2\/content-type?post=29689"},{"taxonomy":"language","embeddable":true,"href":"https:\/\/www.ssi-corporate.com\/ja\/wp-json\/wp\/v2\/language?post=29689"},{"taxonomy":"phase","embeddable":true,"href":"https:\/\/www.ssi-corporate.com\/ja\/wp-json\/wp\/v2\/phase?post=29689"},{"taxonomy":"partner-type","embeddable":true,"href":"https:\/\/www.ssi-corporate.com\/ja\/wp-json\/wp\/v2\/partner-type?post=29689"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}