SSI 30th Anniversary
        • Design
        • The most significant opportunities to impact the cost of building and operating a ship are found in the design and engineering phase.

          Initial Design  |  Basic Design  |  Detailed Design

        • Build
        • Even a smaller shipbuilding project is immense in scope and scale. Manage the challenges that are unique to ship construction.

          Prepare  |  Fabricate  |  Assemble

        • Maintain
        • With the majority of a ship’s life taking place after it’s been built, it’s crucial to ensure that the organization has a clear picture of the vessel at all times.

          Assess  |  Manage  |  Repair / Refit

        • Nexus
        • SSI Nexus is the place where users, creators, & implementers of SSI software get together. Here they discuss best practices & industry trends, tackle common challenges, gain access to the latest software, and provide input into the future of the products that bring them together.

        • MyLearning
        • SSI MyLearning is where SSI users can access detailed training exercises, materials, courses, and certifications. The self-directed training curriculum ensures that training happens on your schedule and when you need it most.

        • SSI Blogs
        • The SSI blog is your place to get insights into the intersection of shipbuilding and technology, how our industry is moving forward, and keep up with SSI news. It’s the only place to read the latest from Denis Morais and Darren Larkins, SSI’s co-CEOs.

          Lighthouse Waveform  |  Crow’s Nest

        • Company
        • Learn more about SSI and our leadership.

        • Locations & Contact
        • You need a partner with a global presence.

        • News
        • The latest on SSI and shipbuilding.

        • Events
        • Join us at our next event, conference, or trade show.

        • Partners
        • Learn more about our Platform and Development Partners.

        • Clients
        • See the industry leaders who trust SSI.

        • Careers
        • Help us make the business of shipbuilding possible.

May 16, 2018
Client NewsSSI News

Patrick Roberts was honored to be invited by Austal.

In recognition of the contribution that SSI has made towards building the Independence Class of the US Navy’s Littoral Combat Ships, Austal USA invited SSI USA Director of Operations Patrick Roberts as a VIP guest to witness the Christening of LCS 20 Cincinnati on May 5, 2018.

Austal uses SSI’s ShipConstructor software for design/engineering and earlier this year, Roberts helped Austal advocate for funding of the Littoral Combat Ship Program by meeting with US Senators and House Representatives to discuss the FY2018 and FY2019 Department of Defense Budget.

Austal has delivered two Littoral Combat Ships to the Navy in 2018 while another five are under construction. LCS 18 is preparing for sea trials as LCS 20, 22, 24 and LCS 26 follow close behind. Additionally, Austal has two more Littoral Combat Ships in a pre-construction phase, LCS 28 and LCS 30.

In addition to being in full rate production for the LCS program, Austal is also the Navy’s prime contractor for the expeditionary fast transport (EPF) program. Austal has delivered nine EPF vessels, while an additional three are in various stages of construction.

Austal is using SSI’s ShipConstructor on all these projects.

“It was an honor to be invited to the Christening of LCS 20,” said Patrick Roberts. “SSI is proud to support Austal’s success.”

Leave a Reply

Your email address will not be published. Required fields are marked *

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.